tauranga - commercial earthworks projects
![]() KFC Mt Maunganui |
![]() McLaren's Falls - Boat ramp |
![]() ASB Underground Carpark |
![]() Lakes Bypass - Pyes Pa |
![]() Tga Hospital Water Tanks |
|
KFC Mt Maunganui - Rebuild
Mclaren's Falls - Boat ramp
ASB Bank - Underground Carpark in Tauranga
We prepared the site, drilled 6.2m holes for the foundations and removed excess fill. The project required temporary support of the neighbouring Westpac wall. Then we backfilled the exterior walls.
BNZ Building - Tauranga
Stage 1: We cut site to level, undercut and backfilled footings to engineered standard. Then we prepared areas for concrete, including all material supply and compaction. Stage 2: Created carpark area, including kerbing and asphalt.
click images to enlarge
Lakes Bypass - Pyes Pa
Tauranga Hospital - Emergency Water Tanks







Demolition | Commercial | Residential | Slip Repair
Earthmoving | House Sites | Driveway Preparation | Lawn Preparation | Clearing Fence Lines | Demolition
Building Site Clearing | Footings | Infill Carparks | Site Supervision | Project Supervision